Bussiness Units
ICT Fixture and Program
ICT Capabilities
  • We have fixture and program capability in below platforms
    • Teradyne: Z18xx, Spectrum, TestStation
    • Agilent: 3070, i1000
    • TRI: TRI8001,TR5001
    • MDA: TRI518, JET etc
  • DFT analyze
  • Boundary Scan including BIT, VIT and VCCT, SiliconNail
  • On board programming, including integrate 3rd programmer in ICT
  • Analog, digital and mixed library developing
  • Program fine tuning
  • Data flow system integrate
  • FCT module integrate with ICT
 
RFQ and Quotation
  • Customer RFQ
    • CAD/Gerber, Schematics, BOM, Special Test Requirement, ICT Tester Configuration
  • MT Quote Report
    • Quotation, Net Access Report, DFT Report, Test Proposal
 
ICT Project Process
  • Start
    • Sales confirm PO and quotation, and inform starting project
    • Customer need supply final CAD,BOM, Schematic, clarify special requirement if have,one golden board and one bare board
  • Prepare:AE will run out program structure file and fixture files
  • Fixture building:Fixture house drilling, milling, wiring and assembling fixture
  • Program build:Upon structure of program, finish analog, digital programming, also library setup
  • Integrate:Integrate program and fixture on the ICT
  • QA and shipping:Quality checking, packaging and shipping
  • On site debug:On site fine tuning with volume boards to make sure stability and coverage, close acceptance
  • Warranty:One year warranty service
 
Delivery Time
Test Points 500 1000 1500 2000 2500 3000
Days of fixture and basic programming 7 10 13 18 22 25
  • The time upper excluding special test requirement
  • If there are some parts with advance programming, such as BS, OBP etc, each part adds 0.5 day
 
Service
  • 7*24 experts response
  • Quarterly visiting of feedback fixture and program using
  • On site installation, acceptance and training
  • 4 hours response in Yangtze Delta
 
Project Cases